The 2026 Two Men and a Truck FDD moves the Item 7 estimated initial investment range from $92,100–$506,450 to $92,100–$512,450, and the system grows from 339 to 351 outlets year-over-year. Both filings include an Item 19 financial performance representation.
| 2025 FDD | 2026 FDD | Change | |
|---|---|---|---|
| Low end of range | $92,100 | $92,100 | unchanged |
| High end of range | $506,450 | $512,450 | +$6,000 (+1.2%) |
| Full range | $92,100–$506,450 | $92,100–$512,450 |
The 2026 filing puts the Item 7 estimated initial investment at $92,100–$512,450, versus $92,100–$506,450 in the 2025 filing. The low end is unchanged and the high end moves by +$6,000 (+1.2%).
| 2025 FDD | 2026 FDD | Change | |
|---|---|---|---|
| Total outlets (Item 20) | 339 | 351 | +12 (+3.5%) |
Two Men and a Truck reports 351 outlets in the 2026 FDD, versus 339 in the 2025 filing (+12 (+3.5%)).
Two Men and a Truck included an Item 19 financial performance representation in both the 2025 and 2026 filings.